Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 05/15/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
Verbal clearance to TEP RECN. (DE RATE TO 175) 5/15/2025 |
| 05/27/2025 |
BULD - Electrical Clearance |
|
Re-inspection required |
plans call for derate to 175 amps but pictures still show 200 amp main breaker 5/27/25 |
|
BULD - Electrical Clearance |
|
Not Ready |
Failed per pics - missing derate placard, 2 back feed breakers in service panel? |
| 06/16/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar - DGC Clearance to TEP is required for the solar meter |
| 06/16/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar - DGC Clearance to TEP is required for the solar meter |