Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 05/14/2025 |
BULD - Electrical Clearance |
|
Canceled |
Canceled per contractor. 5/14/2025 |
| 06/02/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial for the Tesla meter switch - DGL clearance was called into TEP - Pending solar |
| 06/04/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar with powerwall-3 per pics - DGC/BAT Clearance to TEP is required for the solar meter |
| 06/04/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar with powerwall-3 per pics - DGC/BAT Clearance to TEP is required for the solar meter |