Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance was called into TEP Pending Solar |
|
| 06/05/2025 | BULD - Electrical Clearance | Passed | Installed per stamped plans 6/5/25 CLEARANCE DGC |