Permit: TC-SOL-0425-00429

Parcel: 136343320


Addresses:

7320 E FAYETTE ST

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/25/2025 BULD - Electrical Clearance Partial Pass Partial for the 200A service panel upgrades - INCR Clearance was called into TEP
Pending solar
09/19/2025 BULD - Electrical Clearance Partial Pass 9/19/25
TEP CLEARANCE: DGL, called in to TEP @ 11:00.
09/25/2025 BULD - Electrical Clearance Re-inspection required 9.25.2025
Solarspp checklist does not match 3-line diagram in plan - revise and upload into TCD online portal.
10/29/2025 BULD - Electrical Clearance Not Ready
11/17/2025 BULD - Electrical Clearance Passed 11/17/25 correct documents submitted, CLEARANCE DGC/BAT