Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrades - INCR Clearance was called into TEP Pending solar |
|
| 09/19/2025 | BULD - Electrical Clearance | Partial Pass | 9/19/25 TEP CLEARANCE: DGL, called in to TEP @ 11:00. |
|
| 09/25/2025 | BULD - Electrical Clearance | Re-inspection required | 9.25.2025 Solarspp checklist does not match 3-line diagram in plan - revise and upload into TCD online portal. |
|
| 10/29/2025 | BULD - Electrical Clearance | Not Ready | ||
| 11/17/2025 | BULD - Electrical Clearance | Passed | 11/17/25 correct documents submitted, CLEARANCE DGC/BAT |