Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | BULD - Electrical Clearance | Re-inspection required | 04/02/2026 Revised plans to reflect 30A rated disconnect, current plans show 60A. |
|
| 04/07/2026 | BULD - Electrical Clearance | Passed | Clearance to TEP DGC/BAT. 4/7/2026 |