Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2026 | BULD - Electrical Clearance | Partial Pass | 7.13.26 TEP CLEARANCE: DGL, called in at 9:52. Partial pass |
|
| 07/22/2026 | BULD - Electrical Clearance | Re-inspection required | 7.22.26 Plan calls for 3 strings, 6 panels per string. Current install has 2 strings. Please update plans to reflect change or run the 3rd string. |
|
| 08/03/2026 | BULD - Electrical Clearance | Passed | Passed |