Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 10:40am Pending solar |
|
| 05/27/2025 | BULD - Electrical Clearance | Re-inspection required | Plans received call for Tesla, site has solar edge equipment, need correct paperwork submitted | |
| 05/27/2025 | BULD - Electrical Clearance | Re-inspection required | Plans received call for Tesla, site has solar edge equipment, need correct paperwork submitted | |
| 06/18/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 06/18/2025 | BULD - Electrical Clearance | Passed | duplicate |