Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter - DGLClearance was called into TEP at 10:30am Pending solar |
|
| 07/02/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance is required for the solar meter |