Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 40A meter adapter - DGL Clearance was called into TEP at 10:15am Pending solar |
|
| 07/10/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |