Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrades - INCR Clearance was called into TEP Pending solar |
|
| 07/09/2025 | BULD - Electrical Clearance | Passed | Approved solar per SolarApp - DGC Clearance to TEP is required for the solar meter |