Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2025 | BULD - Electrical Clearance | Canceled | 05/02/25 Cancelled per contractor. |
|
| 06/12/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap, DGL Clearance was called into TEP at 2:20pm Pending solar |
|
| 06/16/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |