Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:25pm Pending solar |
|
| 07/09/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 11:15am Pending solar final |
|
| 07/23/2025 | BULD - Electrical Clearance | Passed | Approved solar with battery - DGC/BAT Clearance to TEP is required for the solar meter |