Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2026 | BULD - Electrical Clearance | Re-inspection required | 03/26/2026 Backup load center panel wires require 3AWG for 100A but field installation has 4AWG. |
|
| 04/13/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC/BAT. 4/13/2026 |