Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 100A (like for like) distribution panel upgrade - INCR Clearance was called into TEP at 1:00pm Pending solar |
|
| 04/02/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |