Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 125A service panel upgrade - INCR Clearance was called into TEP at 1:30pm Pending solar |
|
| 04/29/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |