Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | BULD - Electrical Clearance | Canceled | NR, several attempts to contact field tech with no response, please reschedule | |
| 07/08/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 11:00am Pending solar |
|
| 07/11/2025 | BULD - Electrical Clearance | Failed | Failed, approved SolarApp Checklist is required to match the installation | |
| 07/23/2025 | BULD - Electrical Clearance | Passed | Approved solar with PW 3 battery - DGC/BAT Clearance to TEP is required for the solar meter |