Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | BULD - Electrical Clearance | Passed | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 9:30am Pending solar |
|
| 04/17/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |