Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2025 | BULD - Electrical Clearance | Not Ready | NR, cancelled by contractor, no access | |
| 04/17/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 40A meter adapter - DGL Clearance was called into TEP at 2:35pm only to restore power to the home. (Note: pending solar and generator installation requires plan approvals for both prior to final inspections) |
|
| 05/05/2025 | BULD - Electrical Clearance | Not Applicable | duplicate | |
| 04/29/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 05/15/2025 | BULD - Electrical Clearance | Not Applicable |