Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2025 | BULD - Electrical Clearance | Canceled | by contractor | |
| 02/25/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter- DGL Clearance was called into TEP Final - Failed for placards |
|
| 02/26/2025 | BULD - Electrical Clearance | Passed | Approved solar and powerwall 3 installation - DGC/BAT Clearance to TEP is required |