Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade and Tesla meter switch - INCR/DGL Clearance was called into TEP at 12:18pm Pending solar final |
|
| 07/25/2025 | BULD - Electrical Clearance | Deferred | Passed solar final 7/25/25 CLEARANCE DGC | |
| 07/30/2025 | BULD - Electrical Clearance | Passed | Passed CLEARANCE DGC/BAT |