Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
03/10/2025 BULD - Electrical Clearance Partial Pass Partial pass pending solar, CLEARANCE INCR called Marcia 12;00 to restore power
03/20/2025 BULD - Electrical Clearance Canceled NR
03/20/2025 BULD - Electrical Clearance Canceled NR
03/27/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter
03/27/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter