Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 02/10/2026 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
3/4" and x1 1 1/12" schedule 40 at 18" depth. Coming from the main panel location (transfer switch) ran to new generator pad location. Ensure above goring conduit is either scheduled 80 or rigid metal conduit. Okay to backfill progress areas. Shading required. 2/10/2026 |
| 02/25/2026 |
COT - LCEL - Electrical Underground |
|
Canceled |
|
| 04/27/2026 |
COT - LCEL - Electrical Underground |
|
Passed |
|