Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2026 | BULD - Electrical Clearance | Partial Pass | Partial pass. Verbal clearance to TEP INCR. 2/12/2026 | |
| 03/11/2026 | BULD - Electrical Clearance | Partial Pass | Partial pass for Tesla switch CLEARANCE DGL | |
| 03/11/2026 | BULD - Electrical Clearance | Passed | Passed CLEARANCE DGC/BAT 3/11 26 | |
| 03/19/2026 | BULD - Electrical Clearance | Passed | Passed 3/29/26 CLEARANCE DGC/BAT | |
| 04/03/2026 | BULD - Electrical Clearance | Passed | 04/03/2026 Approved clearance TEP DGL verbal at 8:50am. Tesla meter socket replaced only to existing system. |
|
| 04/22/2026 | BULD - Electrical Clearance | Not Ready |