Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2025 | RSBU - Building Final | Passed | 12.22.25 Approved Insulation verified Unit verified Electrical disconnect verified T&P line and 90 termination verified |