Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
Permit Number - TC-RES-1224-07517
Inspection Description - BULD - Electrical Clearance
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2025 | BULD - Electrical Clearance | Not Ready | 6/27/25: revision required for changes to Electrical main panel if existing panel is to remain. Approved plans are calling for new 200 amp main panel. | |
| 07/01/2025 | BULD - Electrical Clearance | Partial Pass | 6/27/25: revision required for changes to Electrical main panel if existing panel is to remain. Approved plans are calling for new 200 amp main panel. 7/1/25: RECN TEP CLEARANCE. REVISE PLAN SET PRIOR TO FINAL |
|
| 07/23/2025 | BULD - Electrical Clearance | Re-inspection required | 7.23.25 Missing gfci under kitchen sink. Missing hammer arrester at main kitchen. Missing hammer arrester at laundry. Missing outlet at primary bedroom Toilet center must be 15" from lav and bath 3rd party verify non ul listed mini s-lots Paint exterior plastic Ground water heater Insulate water lines at water heater Arc faults missing at panel Panel not per plan |
|
| 07/30/2025 | BULD - Electrical Clearance | Not Ready | 7-30-25: not ready-contractor will reschedule. | |
| 08/18/2025 | BULD - Electrical Clearance | Passed | 8.18.25 Satisfactory corrections implemented as requested APPROVED |