Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-1224-07517
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-18-25, on exterior walls where the mudsill was replaced, add anchor bolts as required per the 2018 IRC, DWV not under test-strap or secure DWV, missing backing on restrooms, smoke detectors are required in each bedroom and adjacent room thereafter (hardwire smoke detectors), all metal electrical metal boxes must be grounded and made up at time of inspection, submit a revision for subpanel in sleeping quarters together with note to reflect fur out walls. | |
| 05/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 5-8-25, electrical layout not per plans-missing receptacles throughout-(see plans for details), bathroom layout for new sleeping quarters not per plans. Submit an updated floor plan to the city for review. A 12" clearance is required between can lights or recessed lighting and pex. Either relocate pex lines or block using osb, 2x4's, plywood, or drywall. DWV must be under test, seal all penetrations throughout vapor barriers, and block all showers, toilets, and bathtubs-see City of Tucson Inclusive website for details | |
| 06/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Lock Box code was given in notes. Got to the property walked around to look for it and no lock box was in sight. Need access to site. 6/6/2025 | |
| 06/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. All corrections have been made. 6/9/2025 |