Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | COT - RSME - Mechanical Final | Re-inspection required | 7/24/25: Revision required for changes made to HVAC plan (Manual J required), Air handler was placed in attic and attic opening none code compliance, crawl space in attic is not code compliance, clearance in-front of equipment in attic is not code compliance, receptacle in hallway at new bedrooms not working, receptacle at bathrooms must be GFCI and receptacle spacing at bathrooms not code compliance, properly label all new circuits at main panel. New circuits at main panel must be ARC-Fault protected, penetration at refrigerant lines must be sealed with approved material. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
| 07/25/2025 | COT - RSME - Mechanical Final | Re-inspection required | 7.25.25 Revision required for changes made to HVAC plan (Manual J required), Air handler was placed in attic and attic opening not in code compliance, crawl space in attic is not code compliance, clearance in-front of equipment in attic is not code compliance. properly label all new circuits at main panel. New circuits at main panel must be ARC-Fault protected. West and East AC breakers are over amped. Outlet, light and switched required at attic crawl space entrance. |
|
| 07/31/2025 | COT - RSME - Mechanical Final | Re-inspection required | 7.31.25 Correct receptacle at hallway per plan or submit revision for alternate receptacle at a circuit (not bathroom circuit) Correct access to air handler, duct work currently makes AH inaccessible |
|
| 08/01/2025 | COT - RSME - Mechanical Final | Passed | 8.1.25 Corrections made |