Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 2:15pm Pending solar |
|
| 05/28/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP Pending solar |
|
| 06/03/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required | |
| 06/03/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required |