Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2025 | RSBU - Building Final | Re-inspection required | 1. In the container; light switch electrical needs grommet; incoming Romex for panel needs grommet. 2. Exposed romex needs to be in conduit inside the container 3. Separate the grounds and neutrals in sub panel. 4. Provide receptacles for lighting in container or hardwire. 5. Cannot run romex on the exterior, please use THWN wires in the conduit. 6. Use liquid tite conductor and fittings on all fixture connections exterior. |
|
| 10/28/2025 | RSBU - Building Final | Passed |