Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2025 |
RSBU - Building Final |
|
Re-inspection required |
Not ready. Add arc fault breakers per note 9 on electrical notes. Provide gfci receptacles at counter tops. Receptacle exceeding 2' from range. Add nail plates to electrical lines that are less than an 1 1/4". Add ground screws to all metal boxes. Cover up holes before final inspection. 4/21/2025 |
| 05/06/2025 |
RSBU - Building Final |
|
Passed |
5-6-25, required corrections from previous inspection were made. Building final approved. |