Permit: TC-RES-1224-07416

Parcel: 126063030


Addresses:

4110 E 4TH ST

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
06/09/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 6-9-26: fire foam all penetrations at top plates and at horizontal penetrations from garage to home, add r3 insulation to pex lines.
06/16/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections made
12/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Dwv not on test, add ground screws to metal boxes at exterior, fire foam needed at penetrations through top plate, secure all wires coming out of panel, complete fire block at furnace, move thermostat to 48 inch height
12/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12-12-25: secure all DWV and pex lines with straps/clamps, 18" of copper are required at water heaters and at main water stemming into the house before transitioning to pex, add straps to flex to prevent it lying directly on trusses, firefoam all horizontal penetrations at interior plastered walls and at any DWV penetrating top plates.
12/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass house only; garage remains to be inspected..