Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2025 | BULD - Electrical Clearance | Canceled | Canceled per contractor. 5/16/2025 | |
| 07/10/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 400A service panel upgrade - INCR Clearance was called into TEP at 2:35 pm Pending solar final |
|
| 07/18/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |