Inspection History Details
Inspection Status: Partial Pass
Inspection History: Pool/Spa - Electric
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | Pool/Spa - Electric | Partial Pass | Electrical for pool lights, pool equipment, and control panel is roughed in. | |
| 03/12/2025 | Pool/Spa - Electric | Re-inspection required | 12 March 25 Not ready, contractor was still working on the gate when I arrived. He called me back after 3 hours and he didn't know about pet door. Please reschedule. |
|
| 03/14/2025 | Pool/Spa - Electric | Passed | 3/14/25 corrections made |