Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSPL - Rough Soil | Not Ready | 1-Existing sewer line for house in rear of this permitted house has been replaced with 4” ABS, from old clay to old clay. The New line runs under the house being built on this permit, with a Wye fitting intended to tie in the house being built on the same lateral. 2-No approved plans on site. 3-When digital plans finally loaded, they show a separate 4” lateral for the new house. Directed workman to obtain approved revision to this permit, and have it on site for future inspections. |
|
| 05/20/2025 | COT - RSPL - Rough Soil | Partial Pass | 5/20/25 Partial pass, sewer line 25% done. |
|
| 06/27/2025 | COT - RSPL - Rough Soil | Passed |