Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | BULD - Electrical Clearance | Passed | Approved (2) 125A service panel upgrades - INCR Clearance to TEP was called at 1:55pm for each service (77 S. Grande Ave and 79 S. Grande Ave) |