Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called intoTEP Pending solar |
|
| 07/28/2025 | BULD - Electrical Clearance | Passed | Approved battery addition to existing solar - BAT Clearance to TEP is required |