Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | BULD - Electrical Clearance | Passed | 20 FEB 25 TEP CLEARANCE: DGL, called in @ 11:07. |
|
| 03/18/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |