Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | BULD - Electrical Clearance | Passed | Approved with powerwall 3 installation - DGC/BAT Clearance to TEP is required for the solar meter |