Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A fused disconnect and main backup panel - INCR Clearance was called into TEP at 10:55am Pending solar system installation |
|
| 06/03/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required | |
| 06/03/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required |