Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 06/26/2024 | BULD - Electrical Clearance | Not Ready | NOT READY Called Gail at 4143033254. This # does not accept texts or calls, to arrange the video inspection. Tucson does 99% of solar inspections on video. Please reschedule and add contact phone # for video inspection |
|
| 07/15/2024 | BULD - Electrical Clearance | Canceled | 7/15/24; canceled per contractor | |
| 07/22/2024 | BULD - Electrical Clearance | Re-inspection required (with fee) | 7/22/24 - Called contact # 602-396-0777 3x and texted 3x before 10:30, with no response. Called and left message at PNW.Permitting at 10:30 with no response. This is the 2nd occurrence from this company. Therefore, pay a re-inspection fee before rescheduling this permit for inspection. |
|
| 07/26/2024 | BULD - Electrical Clearance | Partial Pass | 7/26/24 - Project is complete with one exception. It needs a hard to find 70A double pole breaker, for the backfeed connection. Once this breaker is installed, it will be complete and ready to energize. All inspections for this system can only be partially approved until complete. | |
| 10/23/2024 | BULD - Electrical Clearance | Not Ready | 10/23/24 cancelled per contractor. |