Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | BULD - Electrical Clearance | Partial Pass | RECN CLEARANCE called to TEP at 12:40 for LST installation. CLEAR DGL |
|
| 04/08/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |