Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the meter collar, DGL Clearance was called into TEP at 12:00pm Pending solar |
|
| 04/02/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the service panel upgrade, INCR Clearance was called into TEP at 1:00pm Removing meter collar, Pending solar |
|
| 04/04/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |