Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2024 | BULD - Electrical Clearance | Partial Pass | 3/27/24: INCR VERBAL CLEARANCE TO TEP AT 11:41am (new load center). Partial pass pending PV Clearance. | |
| 04/02/2024 | BULD - Electrical Clearance | Partial Pass | 4/2/24 - new meter socket panel installed. RECN CLEARANCE called to TEP at 10:20 for meter socket replacement PK. This completes the INCR part of the solar install, so CLEAR INCR |
|
| 04/09/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |