Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel w/ 125A derate, INCR Clearance to TEP is required for the cutover Pending solar |
|
| 08/27/2024 | BULD - Electrical Clearance | Partial Pass | Panel was relocated, Partial for the 200A service panel w/ 125A derate, please resend INCR Clearance to TEP for the cutover Pending solar |
|
| 10/11/2024 | BULD - Electrical Clearance | Not Ready | ||
| 10/21/2024 | BULD - Electrical Clearance | Not Ready | ||
| 10/30/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery install - DGC/BAT Clearance to TEP is required for the solar meter |