Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/02/2023 BULD - Electrical Clearance Partial Pass Partial for meter adapter, DGL Clearance was called into TEP at 9:15am (power-kill)
06/30/2023 BULD - Electrical Clearance Canceled 6/30/23: Cancelled per contractor.
07/14/2023 BULD - Electrical Clearance Canceled
07/19/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter