Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-1222-01595
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 2/27/24: seal all penetrations going through top plate throughout, DWV not under pressure, Water lines not under pressure, dryer exhaust duct not terminated through the wall at laundry room, 18" of copper is required at water heater before transitioning over to pex, carport door opener receptacle missing per plans, exterior lighting calls for 20Amp breaker which would need 12AWG wire, electrical wire at kitchen west wall needs to be properly ran to avoid damage to wire or sheathing, missing receptacle under kitchen sink,penetrations going through exterior vapor barrier must be sealed, 20AMP circuits require 12AWG wire per plans (15 AWG installed throughout), receptacle at dining room at north wall tied into small appliance circuit at kitchen, wire not ran to bathroom receptacle box, exhaust fan missing at bathroom.STOPPED INSPECTION MORE ITEM MAY BE ADDED. | |
04/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
05/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Failed | Corrections not completed. |