Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-1222-01578
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Canceled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | wrong inspection type. recreated rebar/footings inspection and passed it. | |
05/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 6/30/23: not ready (framing inspection was needed) | |
09/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 1-Complete wiring of kitchen island. 2-Provide access for air handler above dining room complete with Code compliant path, lighting, and clearances. 3-Seal/Complete fire-blocking per Code. Stopped inspection at fireplace, due to construction not matching Figure 1001.1. |
|
10/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-11-23: Wiring to kitchen island has been completed, attic access for air handler above dining room is now code compliant with solid decking, 2 light fixtures and light switch at access entry point. Wood framing around fire place has been removed and replaced with metal stud framing. All other mechanical, electrical, and plumbing work is completed and meets code requirements. Okay to proceed with insulation, sheet rock, taping, texturing, and painting interior walls. |