Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
05/02/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/2/23: vents are empty; fill with water thru the roof, nail plates required at ABS, ground metal elect boxes. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION.
Port-A-John required on site before next inspection.
05/19/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass DWV is full along with pex lines. Plumbing pass. Partial pending securing electrical lines fire foam all top penetrations. Duct needs to be installed and a gas pressure test. 5/19/2023
07/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/2/23: vents are empty; fill with water thru the roof, nail plates required at ABS, ground metal elect boxes. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION.
Port-A-John required on site before next inspection.

DWV is full along with pex lines. Plumbing pass. Partial pending securing electrical lines fire foam all top penetrations. Duct needs to be installed and a gas pressure test. 5/19/2023

7/1/23: engineering required for cut & over-notched rafters under new skylight, most of the rewiring is incorrect per approved plans, block all duct openings, CSST installed without listed supports and listed nail protection. The installer is required to be certified to install CSST. Framing between laundry/kitchen area and dining room is not per plan.
08/24/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/24/2023 Approved. Corrections were made.