Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2023 | BULD - Electrical Clearance | Passed | 5/5/23- INCR VERBAL CLEARANCE TO TEP @ 12:40pm | |
| 10/21/2025 | BULD - Electrical Clearance | Passed | Tesla backup switch approved for DGL clearance code. | |
| 12/04/2025 | BULD - Electrical Clearance | Passed | 12.04.2025 Clearance TEP BAT. Added two Tesla Powerwall batteries to existing solar system. |