Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | RSBU - Building FinalĀ | Passed | 4/15/26 1. Tighten 2 loose nuts on A.B. northwest post. |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | RSBU - Building FinalĀ | Passed | 4/15/26 1. Tighten 2 loose nuts on A.B. northwest post. |